Road User Charging -The Solution?
Road pricing is one of the key issues to be addressed in European transport. It could prove to be an important tool in achieving a reduction in urban road traffic and associated environmental nuisance, but there may be problems of public and political acceptance. International case studies, e.g. in Singapore and Hong Kong, have shown that acceptability is greater where the revenues are seen to be clearly fed back into developing public transport and road systems. The European Commission is supporting a number of major research projects on transport pricing in an effort to compile a body of practical information and guidance which will assist public authorities in planning, implementing and operating successful transport pricing schemes. The European Transport Pricing Initiative (ETPI) CUPID (see page 2) is one such project.
Road Pricing - Frequently Asked Questions
Where
will the finances come from to cover the set-up costs?
The costs of establishing a road user charging scheme are considerable
and include the expense of infrastructure and personnel as well as lead-in
costs whilst the scheme is being developed, such as public consultation, media
campaigns, and legal/planning costs. Given the sensitivity of the issue, it
is advisable for the local authority to be seen to control any scheme and
to closely regulate private sector input. There are a number of ways, however,
in which the private sector can be encouraged to contribute to the scheme
and help offset set-up costs: Option 1: Full Public Private Partnership The
local authority and private company establish a separate, joint entity which
will both implement the road pricing scheme and develop complementary measures
such as public transport schemes. However it is unlikely to be acceptable
socially until the concept of road pricing is well established. A further
concern is that the private sector partner, as beneficiary of the tolls collected,
may promote the use of the private car in order to maximise revenues. Option
2: Partial Public Private Partnership This is a more acceptable approach in
which the local authority administers the overall scheme and the private sector
invests in selected elements and benefits from the revenues raised. For example,
the road pricing scheme could be privately developed and leased to the local
authority at a fixed rate. The income would cover the leasing costs and subsidies
for an improved private-public transport system. The disadvantage is that
the private sector will be less likely to accept risk transfer where it has
less control over the revenue stream. Option 3: Privately financed publicly
operated scheme In this more conventional approach, the local authority develops
the scheme on its own initiative and raises private finance to support identified
elements of the overall scheme such as the road pricing system and the public
transport scheme, which may be delivered by different contractors. Once again,
care needs to be taken to make sure that private sector partners are not encouraged
to promote car travel by ensuring that toll revenues go directly to the local
authority. Option 4: Public sector investment A viable road pricing scheme
will incur significant start-up costs before it becomes viable. Only when
these costs are met will any operating surplus be released to support infrastructure
investment. A publicly funded approach might be acceptable in a city like
Singapore, but is less appropriate in a major European city where road pricing
strategies need to be underpinned by investment in transport infrastructure.
Only by introducing a low level fee to raise revenues for the development
of infrastructure and increasing fees to a level capable of demand management
once infrastructure is in place might this become a viable option.
How do
we achieve public acceptability of road pricing?
The challenge for the city authority of implementing an urban pricing
project, which is acceptable to the transport user, is considerable. People
regard public roads as ÔfreeÕ goods and any attempt to charge for this commodity
needs to overcome strong emotional resistance. The 6 issues below need to
be addressed if resistance is to be minimised and confidence in urban pricing
as a fair and effective means of achieving positive benefits is to grow. a)
Both politicians and the public must understand the urgent need to find solutions
to traffic problems in cities. Transport pricing needs to be ÔsoldÕ as an
effective and appropriate solution and the messages used to promote marginal
cost pricing should focus on the social and environmental benefits, e.g. improved
air quality, reduction in congestion and increased safety. b) The public needs
to be aware that their travel behaviour has a key role to play in achieving
the benefits listed above. The city authorities therefore need to understand
the values as well as the expectations of the transport users. This is true
throughout the duration of the project, but particularly early on. A crucial
phase is when transport users adjust their behaviour for the first time. It
must be clear to them that their attempts to support commonly shared values
are having an effect. c) Revenues must be allocated in advance to funding
alternative modes of transport. The concepts of traffic restraints and road
charging will be much more acceptable if combined with transport and environmental
improvements. The availability of high quality alternatives to the private
motor car will help achieve lasting changes in travel behaviour. d) The charge
level and the amount to be re-invested in public transport need very careful
consideration. In a cost-benefit-analysis of the scheme the individual should
perceive that the financial burden imposed by the pricing initiative is at
least balanced by the benefits they are gaining. In addition, individuals
should feel that they are being treated equally in comparison with others.
Hypothecation of the revenues should result in a guaranteed level of mobility
for all. Indeed it may be biased towards some disadvantaged groups thereby
supporting equity amongst the population. e) Public acceptability comes from
confidence in the effective operation of the scheme, the use of the revenues
and the fairness and anonymity of the system. Right from the start, it should
be clear to the public who has overall responsibility for the scheme, for
its design and implementation, for charging and accounting, for revenue allocation
- and for defects and deficiencies. Commitment will be reinforced through
early and credible communication, as well as positive experiences of the system
in operation. f) A communications strategy comprising a series of intelligent
and focused PR activities, which gets underway at the initial stages of the
project is imperative if public acceptance and adoption of the scheme are
to be achieved.
How should
we assess and evaluate the impacts of road pricing?
Road pricing for transport is expected to have a substantial impact on
many aspects of the urban area. Many of these impacts are complex and interlinked.
Major benefits will be anticipated by some stakeholders in terms of environmental
improvements, whilst others will be concerned about the impact of pricing
on economic performance.
For further FAQs see Deliverable 3: State of the Art - Frequently Asked Questions
One Project - Eight Cities
Bristol
(UK)
Bristol is at the
leading edge of assessment of road pricing and financing strategies in the
UK. A number of pilot studies have already taken place, along with extensive
consultation. Building on this political foundation the city will be seeking
to implement a full pricing system for the centre of the city.
Copenhagen
(Denmark)
Copenhagen is at the stage of initiating debate on the urban pricing concept
and aims to use the demonstration in PRoGR SS as the basis for developing
this debate. The demonstration will use Global Navigation Satellite Systems
(GNSS) based pricing technology to demonstrate a number of pricing strategies
with 500-1000 users paying real fees.
Edinburgh
(UK)
Edinburgh has been carrying out the hearts and minds exercise with regard
to urban road pricing for sometime. They are now developing initial scheme
ideas and assessing potential operational frameworks. During PRoGR SS they
aim to develop this issue further and build up public and political commitment
to the concept leading to a trial of the initial concept.
Genoa
(Italy)
Genoa, like Rome, has existing access control in its historic centre. The
work carried out in a previous European funded project has provided a sound
understanding of the pricing regimes that could be used to further control
traffic in this historic core. PRoGR SS will demonstrate some of these strategies
and stimulate debate around a wider pricing concept for the city.
Gothenburg
(Sweden) and Helsinki (Finland)
Gothenburg and Helsinki will be developing and modelling a number of pricing
strategies that could be used in their cities. Gothenburg will complement
this with a pricing scheme demonstration using pricing technologies based
on GNSS. Rome (Italy) Rome has an existing access control area which requires
payment for annual permits. A system of electronic enforcement is already
in place. This electronic access control system provides the basis for a pricing
system to be realised in the centre of the city.
Trondheim
(Norway)
Trondheim has probably more practical experience of road pricing than any
other city in Europe. The city’s initial toll ring was established in 1991
and developed further in 1998. The initial focus was on the promotion of road
pricing evaluation of an electronic ticketing system and the city is now building
on its experience to use the system for demand management, integrating the
tolling system with the public transport and parking payment systems.
Scrutinising the Options
The most basic concept is a pricing cordon where vehicles are charged per trip across the cordon boundary. This can be further developed into a zone system where each trip across a zone boundary is charged. These charges may vary according to times of day and different vehicles or user types. This kind of concept is being considered in Trondheim, Bristol, Edinburgh, Rome and Genoa. An alternative is to charge vehicles in line with the time spent or distance travelled in the charging area. Again this charge can be differentiated according to the time of day or user. Rome is looking at this concept through its closed access control system and Copenhagen will also analyse this type of charging through its GNSS system. The technologies that can be used range from paper based systems with manual enforcement through electronic based systems to GNSS systems. A system using radio-based tags with smart card payment is considered the current state of art however GNSS systems may provide a more flexible solution in the near future. All these systems are being trialled. By working through a range of cities at different stages of development, PRoGR SS will provide a strong basis for demonstrating and evaluating a range of innovative pricing concepts and technologies.
To subscribe to future issues of the e-newsletter please click here